Combined Sewer Overflow No. 12

This project is complete. CSO 12 was the final project to eliminate combined stormwater and sewer that discharged to CSO #ZZ outfall to the Mascoma River. The project replaced approximately 4,700 feet of Sewer, and 4,300 feet of Water Main and replaced and added over 4,000 feet of Storm Drainage. Most of the Sanitary Sewer was constructed in the 1940s of Vitrified Clay Pipe that was subjected to inflow and infiltration. CSO 12 also added a sidewalk along Mascoma Street to complete the sidewalk connection from Peabody Street to the other side of the bridge over Interstate 89.

You can easily find this page again by going to LebanonNH.gov/CSO12.

 BeforeCSo 12 Before1

AfterCSO 12 After1

  1. Project Information

Project Information

Subscribe to receive alerts

Contact Information


Public Works Department

Main: 603-448-3112

Project Contacts

Jay Cairelli
Assistant Public Works Director
Email Jay Cairelli