Approved CIP 2016-2021
A 6-year Capital Improvements Program (CIP) is developed and updated annually. The following pages contain the City of Lebanon's 2016-2021 CIP. The cost of individual projects are based on the best estimates available at the time this plan was prepared; actual project costs are a function of detailed study by architects and engineers.
This 2016-2021 Capital Improvements Program (CIP) is an essential component of the City's financial planning effort and provides the long range perspective and framework for addressing its capital improvements needs. As a companion to the annual budget, the CIP provides the mechanism for anticipating future facility and infrastructure requirements and ensuring that they are funded in a responsible and systematic fashion.
This 2016-2021 Capital Improvements Program (CIP) is an essential component of the City's financial planning effort and provides the long range perspective and framework for addressing its capital improvements needs. As a companion to the annual budget, the CIP provides the mechanism for anticipating future facility and infrastructure requirements and ensuring that they are funded in a responsible and systematic fashion.
Program Overview
Capital Improvements Program
2016-2021 CIP Projects
- 10. Mechanic Street Bridge 120-115 (PDF)
- 11. Combined Sewer Overflow and Utility Replacement (PDF)
- 12. Vehicle Replacement (PDF)
- 13. Ambulance Replacement (PDF)
- 14. Landfill Recycling Facility Redesign (PDF)
- 15. Landfill Replace 10 - Wheel Dump Truck 88-01 (PDF)
- 16. Fleet and Equipment Replacement (PDF)
- 17. Landfill Maintenance Building Expansion (PDF)
- 18. Downtown Visioning and Tunnel Project (PDF)
- 19. Terminal Building Boiler and Rooftop AC Units (PDF)
- 20. Reconstruct Easterly Taxiway B (PDF)
- 21. Mechanic Street Reconstruction (PDF)
- 22. Engine 4 Replacement (PDF)
- 23. Station Alerting System Replacement (PDF)
- 24. Capacity Management Operations Maintenance Plan (PDF)
- 25. Emergency Intersection Control System (PDF)
- 26. South Main Street Bridge 062-117 (PDF)
- 27. Mascoma River Greenway (PDF)
- 28. Packard Hill Bridge 154-113 (PDF)
- 29. Replacement of Snowblower 11 (PDF)
- 30. Mack Avenue Utility Replacement (PDF)
- 31. Landfill Compactor Rebuild 40-07 (PDF)
- 33. Rescue 1 Replacement (PDF)
- 34. Phase 1 City Hall Improvements (PDF)
- 35. Phase 2 City Hall Improvements (PDF)
- 36. Personal Protective Equipment Replacement (PDF)
- 37. Trues Brook Bridge 066-059 (PDF)
- 38. Landfill Phase III Preliminary Design (PDF)
- 39. Landfill Recycling Center Skid Steer Replacement (PDF)
- 40. Hillcrest Acres Infrastructure Construction (PDF)
- 41. Streets Rehabilitation - Reconstruction (PDF)
- 42. Mill Road Slope Stabilization and Drainage Improvements (PDF)
- 43. Ladder 1 Replacement (PDF)
- 44. Water Treatment Facility Upgrade (PDF)
-
Planning & Development
Physical Address
51 N. Park St.
5th Floor
Lebanon, NH 03766
Mailing Address
51 N. Park St.
Attn: Planning & Development
Lebanon, NH 03766
Phone: 603-448-1524Fax: 603-442-6141
Send a Secure Email
Hours:
Monday - Thursday
7:00 a.m. - 5:00 p.m.
Closed Fridays.
David Brooks
Planning & Development Director