Approved CIP 2017-2022
A 6-year Capital Improvements Program (CIP) is developed and updated annually. The following pages contain the City of Lebanon's 2017-2022 CIP. The cost of individual projects are based on the best estimates available at the time this plan was prepared; actual project costs are a function of detailed study by architects and engineers.
This 2017-2022 Capital Improvements Program (CIP) is an essential component of the City's financial planning effort and provides the long range perspective and framework for addressing its capital improvements needs. As a companion to the annual budget, the CIP provides the mechanism for anticipating future facility and infrastructure requirements and ensuring that they are funded in a responsible and systematic fashion.
This 2017-2022 Capital Improvements Program (CIP) is an essential component of the City's financial planning effort and provides the long range perspective and framework for addressing its capital improvements needs. As a companion to the annual budget, the CIP provides the mechanism for anticipating future facility and infrastructure requirements and ensuring that they are funded in a responsible and systematic fashion.
Program Overview
Capital Improvements Program - Body of Documents
Projects
- 10. Engine 4 Replacement (PDF)
- 11. Radio Replacements (PDF)
- 12. Fire Staff Vehicles Replacements (PDF)
- 13. Combined Sewer Seperation - Utility Replacement (PDF)
- 14. Mechanic Street Bridge 120-115 Replacement (PDF)
- 15. Downtown Visioning and Tunnel Project (PDF)
- 16. Fleet and Equipment Replacement (PDF)
- 17. Skatepark Redevelopment (PDF)
- 18. Trues Brook Road Bridge 066-059 Replacement (PDF)
- 19. Truck Scale Replacement (PDF)
- 20. Water Treatment Facility Improvements (PDF)
- 21. Loader Replacement (PDF)
- 22. Underground Fuel Storage Tank (PDF)
- 23. Capacity Management Operations Maintenance Plan (PDF)
- 24. Terminal Area ADA Improvements (PDF)
- 25. Airport Business Plan (PDF)
- 26. Airport Layout Plan and Environmental Assessment (PDF)
- 27. Hazard Obstruction Removal (PDF)
- 28. Airport Terminal Building Boiler and Rooftop AC Units (PDF)
- 29. Mascoma River Greenway (PDF)
- 30. Lahaye Drive Pedestrian and Bike Improvements (PDF)
- 31. Fire Emergency Intersection Control System (PDF)
- 32. Reconstruction Airport Terminal Road and Parking Lot (PDF)
- 33. Runway Safety Area Improvements (PDF)
- 34. City Hall Renovation Phase I (PDF)
- 35. City Hall Renovation Phase II (PDF)
- 36. Fire Rescue 1 Replacement (PDF)
- 37. Fire Station Alerting System Replacement (PDF)
- 39. South Main Street Bridge 062-117 Replacement (PDF)
- 40. Compactor Rebuilding 40-07 (PDF)
- 41. Replace Airfield Snowblower (PDF)
- 42. Ramp Plow Replacement (PDF)
- 43. Personal Protective Equipment Replacement (PDF)
- 44. New Hampshire 120-Hanover Street Bridge 121-117 Replacement (PDF)
- 45. Hillcrest Acres Infrastructure (PDF)
- 46. Snow Removal Equipment Building Expansion (PDF)
- 47. Extend Taxiway A to Runway (PDF)
- 48. Mack Avenue Utility Replacement (PDF)
- 49. Ambulance Replacement (PDF)
- 50. Streets Rehabilitation and Reconstruction (PDF)
- 51. Mill Road Slope Stabilization and Drainage Improvements (PDF)
- 52. Recycling Center Skid Steer Replacement (PDF)
- 53. Landfill Phase III Preliminary Design (PDF)
- 54. Fire Forestry Unit Acquisition (PDF)
- 55. Fire F-350 Utility Vehicle Replacement (PDF)
- 56. Fire Ladder 1 Replacement (PDF)
- 57. Mechanic Street Reconstruction (PDF)
- 58. Property Survey Exhibit A Updage (PDF)
-
Nathan Reichert
Planning & Development Director
-
Planning & Development
Physical Address
51 N. Park St.
5th Floor
Lebanon, NH 03766
Mailing Address
51 N. Park St.
Attn: Planning & Development
Lebanon, NH 03766
Phone: 603-448-1524Fax: 603-442-6141
Hours:
Monday - Thursday
7:00 a.m. - 5:00 p.m.
Closed Fridays.